At the request of Mr & Mrs Richardson for whom we had created a kitchen a year earlier we returned with the same team of tradesmen and proceeded to rip out a dated 1960's bathroom and en-suite and install a walk in wet room and bathroom with wet room concept shower area. All the work was undertaken from a scaffold platform erected outside the bathroom window so that all the considerable mess from taking a room back to bare brick and starting again was contained.
Both rooms have wall hung WCs and basins with hidden cisterns and pipework, we installed underfloor heating and both rooms have the water pressure controlled by Salamander pumps and regulating valves so if a bath tap is turned on in one room it does not affect the shower pressure or water temperature in the other.
- Previous
- Next